Final | 6/6/2002 | 6/7/2002 | 6/7/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 11:44:44. Contact: ###-####.
|
Final | 5/3/2002 | 5/6/2002 | 5/6/2002 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 14:50:06. Contact: ###-####. cor. posted called 220 calc p/s, 200.6 #6 or smaller shall not ID, 406.8 bubble cover, 680.26 needs #8 solid for bonding, 680.22 outlets for pool and spa 10ft to 20ft,680.25 needs insulated equip grd from spa switch too spa, 314.23 secure pool light box, 300.12 use connector too terminate non metallic seal tight to spa cabinet, 110.14 use sta-cons for stranded wire terminations 5/6/2002 2:01:56 PM
|
Electrical Rough-In | 3/26/2002 | 3/27/2002 | 3/27/2002 | A | PART |
Jack Frank
|
|
|
###-#### potting and underground (pool) ok 3/27/2002 12:13:48 PM
|
Electrical Rough-In | 3/18/2002 | 3/19/2002 | 3/19/2002 | A | PART |
Jack Frank
|
|
|
###-#### KATHY pool
bond ok no u/g 3/19/2002 10:21:49 AM
|