Final | 3/21/2002 | 3/22/2002 | 3/22/2002 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 21:47:48. Contact: ###-####. 3/22/2002 7:42:59 AM
|
Electrical Rough-In | 3/20/2002 | 3/21/2002 | 3/21/2002 | P | PASS |
Marv Burrus
|
|
|
DAVID ###-####. called sharon for connect to power.
p/s oh r aftershock ele #0776-ok
4-plex. 3/21/2002 3:03:13 PM
|