Final | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | NH |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 12:54:02. Contact: ###-####. no access 6/14/2002 8:18:16 AM
|
Final | 6/14/2002 | 6/14/2002 | 6/14/2002 | P | PASS |
Mike Kinnear
|
|
|
fn barbara- ###-####--key in back yard in the panel by meter- ok final 6/14/2002 2:39:58 PM
|
Final | 6/12/2002 | 6/12/2002 | 6/12/2002 | P | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 07:04:01. Contact: ###-####. not ready t/w contractor 6/12/2002 12:46:07 PM
|
Electrical Rough-In | 3/25/2002 | 3/26/2002 | 3/26/2002 | A | NH |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 03/25/2002 at 12:31:09. Contact: ###-####. no access called 3/26/2002 10:53:11 AM
|
Electrical Rough-In | 3/26/2002 | 3/26/2002 | 3/26/2002 | A | PASS |
Mike Kinnear
|
|
|
Added by Inspector: 412 On 3/26/2002 11:43:13 AM ok cover ri
|
Rough-In Permanent Service | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | CANC |
Mike Kinnear
|
|
|
###-#### BARBARA KEY ON BACK METER
wrong type inspection 3/26/2002 11:42:03 AM
|
Electrical Rough-In | 3/21/2002 | 3/25/2002 | 3/25/2002 | A | FAIL |
Jack Frank
|
|
|
barbara ###-#### please call before going out so barbara can get the home owner there
met with contractor box fill 3/25/2002 10:44:15 AM
|