Final | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 08:08:06. Contact: ###-####. ok 6/13/2002 4:03:34 PM
|
Electrical Rough-In | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 09:56:10. Contact: ###-####.
ceiling ok 5/31/2002 11:54:32 AM
|
Electrical Rough-In | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | NR |
Jack Frank
|
|
|
ceiling insp -don ###-#### no r/i conference only ok some conduit runs have too many bends straping, KOs, support needed for 4, 4sq boxes basement 5/7/2002 4:16:26 PM
|
Electrical Rough-In | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 09:00:33. Contact: ###-####.
walls ok 3/22/2002 3:31:21 PM
|