Final | 7/30/2002 | 7/30/2002 | 7/30/2002 | P | PASS |
Pat Lass
|
|
|
PLEASE CALL FOR ACCESS ###-#### PAT
|
Final | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | NH |
Tim McCullough
|
|
|
PAT; Phone #: ###-####
no/acc/left card 7/26/2002 3:11:32 PM
|
Electrical Rough-In | 4/19/2002 | 4/22/2002 | 4/22/2002 | A | PASS |
Marv Burrus
|
|
|
Pat, ###-####. 2-room addition 4/22/2002 10:48:13 AM
|
Permanent Service | 4/22/2002 | 4/22/2002 | 4/22/2002 | A | PASS |
Marv Burrus
|
|
|
Added by Inspector: 403 On 4/22/2002 10:49:31 AM idaho power has already connected to power
perm/svc oh re miller ele #0820-ok
|