Final | 9/3/2002 | 9/4/2002 | 9/4/2002 | A | PASS |
Tim McCullough
|
|
|
kainoa; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
final
9/4/2002 10:32:23 AM
|
Electrical Rough-In | 5/2/2002 | 5/3/2002 | 5/3/2002 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 20:35:09. Contact: ###-####. upstairs bathroom remodel r/i. 5/3/2002 10:18:43 AM
|
Electrical Rough-In | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 17:11:00. Contact: ###-####. conference; upstairs addition for bathroom branch circuit. 5/2/2002 10:49:59 AM
|