Final | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | PASS |
Mike Kinnear
|
|
|
fn miller elec ###-#### ok final 6/26/2002 3:05:54 PM
|
Final | 5/29/2002 | 5/29/2002 | 5/29/2002 | P | CANC |
Mike Kinnear
|
|
|
fn insp -pat ###-#### wrong type of inspection 5/29/2002 1:30:49 PM
|
Permanent Service | 5/29/2002 | 5/29/2002 | 5/29/2002 | P | PASS |
Mike Kinnear
|
|
|
p/s u/g reconnect called sharon IPCO
|
Electrical Rough-In | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | PASS |
Mike Kinnear
|
|
|
pat ###-#### heated tiles will need to call first so that pat will be there conf. with contractor re. heat mat for bathrm. 5/24/2002 10:29:43 AM
|
Electrical Rough-In | 5/23/2002 | 5/24/2002 | 5/24/2002 | P | CANC |
Mike Kinnear
|
|
|
pat ###-#### heated tiles will need to call first so that pat will be there conf done am inspection 5/24/2002 10:31:40 AM
|
Electrical Rough-In | 5/22/2002 | 5/22/2002 | 5/22/2002 | P | NH |
Mike Kinnear
|
|
|
HEAT MAT ? PAT ###-#### no access called no ans. 5/22/2002 4:02:52 PM
|