Final | 5/14/2002 | 5/14/2002 | 5/14/2002 | P | PASS |
Pat Lass
|
|
|
fn insp-lynn ###-####
finaled with survey to make lighting outlet box in bathroom accessible. 5/14/2002 5:34:31 PM
|
Electrical Rough-In | 4/4/2002 | 4/5/2002 | 4/5/2002 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 16:48:34. Contact: ###-####. went to address nothing done called 403 he wanted it transferred to him 4/5/2002 9:37:55 AM 4/5/2002 11:32:50 AM
added doorway in divider-wall new switches r/i. 4/5/2002 11:57:32 AM
|
Electrical Rough-In | 4/1/2002 | 4/1/2002 | 4/1/2002 | P | PASS |
Marv Burrus
|
|
|
r/i- lynn ###-#### . bedrm., barhrm., utilityrm., addition r/i. 4/1/2002 2:44:40 PM
|