Final | 8/7/2002 | 8/8/2002 | 8/8/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 10:31:27. Contact: ###-####.
final/ok 8/8/2002 11:11:51 AM
|
Electrical Rough-In | 7/9/2002 | 7/10/2002 | 7/10/2002 | A | PART |
Jack Frank
|
|
|
CONFERENCE ###-#### BRAD ok correction posted needs clearence above panelboards basement remove pipes from above panels 7/10/2002 11:19:09 AM
|
Electrical Rough-In | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 15:13:36. Contact: ###-####. ceiling in 911 dispatch cow 6/14/2002 11:17:20 AM
|
Rough-In Permanent Service | 4/18/2002 | 4/19/2002 | 4/19/2002 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/18/2002 at 13:56:21. Contact: ###-####. contractor called in wrong PM#, and address 4/19/2002 1:35:13 PM
|