Final | 9/26/2002 | 9/27/2002 | 9/27/2002 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 12:53:17. Contact: ###-####. ok final 9/27/2002 9:27:21 AM
|
Rough-In Permanent Service | 6/12/2002 | 6/12/2002 | 6/12/2002 | P | PASS |
Tim McCullough
|
|
|
###-#### ALAN ri/ok
ps/ug/new/ok
6/12/2002 5:08:09 PM
|
Electrical Rough-In | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | PART |
Mike Kinnear
|
|
|
FOR SOFET INSPECT ###-#### BOISE BASIN ok cover soffit only 5/30/2002 3:22:46 PM
|
Electrical Rough-In | 5/17/2002 | 5/17/2002 | 5/17/2002 | P | PART |
Jack Frank
|
|
|
trench inspection ###-#### u/g ok 5/17/2002 3:22:14 PM
|
Electrical Rough-In | 4/24/2002 | 4/25/2002 | 4/25/2002 | A | PART |
Mike Kinnear
|
|
|
ALAN ###-#### ok cover underground conduit in slab 4/25/2002 10:01:06 AM
|