Final | 5/29/2002 | 5/30/2002 | 5/30/2002 | A | PASS |
Tim McCullough
|
|
|
NAOMIAI ###-####
finel 5/31/2002 11:50:26 AM
|
Final | 5/29/2002 | 5/29/2002 | 5/29/2002 | P | CANC |
Jack Frank
|
|
|
fn naomai ###-#### NAOMIAI CALLED TO CANCEL THIS INSPECTION AS IT WAS NOT READY YET...5-29-02///DLD
|
Rough-In Permanent Service | 5/8/2002 | 5/8/2002 | 5/8/2002 | P | PASS |
Jack Frank
|
|
|
###-#### TODD r/i ok
p/s o/h for meter seal only ok 5/8/2002 6:11:46 PM
|
Electrical Rough-In | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 07:54:21. Contact: ###-####. cor. posted met with contractor
250.52,104 is water a electrode or just bonding, 250.92 remove GEC or bonding conductor from nipple bottom of p/s,300.4, 334.24, 200 calculations for p/s 5/3/2002 4:35:03 PM
|
Electrical Rough-In | 4/18/2002 | 4/18/2002 | 4/18/2002 | P | FAIL |
Jack Frank
|
|
|
###-#### u/g not deep enough grounding messed up, need more details of job from contractor C O W called 4/18/2002 3:50:48 PM
|
Rough-In Permanent Service | 4/15/2002 | 4/15/2002 | 4/15/2002 | P | FAIL |
Jack Frank
|
|
|
###-#### dog tied up gate open todd called need too meet with contractor COW 4/15/2002 4:24:41 PM
|
Rough-In Permanent Service | 4/12/2002 | 4/12/2002 | 4/12/2002 | P | NH |
Pat Lass
|
|
|
###-#### TODD
no access called will reschedual 4/12/2002 5:04:35 PM
|