Final | 7/11/2002 | 7/11/2002 | 7/11/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 07:05:58. Contact: ###-####.
|
Electrical Rough-In | 6/12/2002 | 6/13/2002 | 6/13/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 12:55:36. Contact: ###-####.
|
Electrical Rough-In | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | PASS |
Jim Schmer
|
|
|
###-#### KELLY 3RD FLOOR SE CORNER rest of r/i 5/3/2002 2:12:33 PM
|
Electrical Rough-In | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | PART |
Marv Burrus
|
|
|
###-#### north side 3rd floor. northend walls r/i. 5/1/2002 8:44:51 AM
|