Final | 7/22/2002 | 7/23/2002 | 7/23/2002 | A | PASS |
Pat Lass
|
|
|
; Phone #: ###-####Ok per 331 7/23/2002 8:20:28 AM
|
Final | 7/22/2002 | 7/22/2002 | 7/22/2002 | P | FAIL |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 07/22/2002 at 08:51:50. Contact: ###-####.
switch behind door to downstairs ,Itold contractor I willcome back this pm but callfor reinspect. 7/22/2002 12:46:24 PM
|
Final | 7/18/2002 | 7/18/2002 | 7/18/2002 | P | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/18/2002 at 09:21:56. Contact: ###-####.
Had conf about receps not working and open grounds and wires hanging and keyless in closet . 7/18/2002 1:11:18 PM
|
Electrical Rough-In | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 17:48:58. Contact: ###-####. Phase 2 ok 6/14/2002 10:08:14 AM
|
Electrical Rough-In | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 12:24:48. Contact: ###-####.
|
Permanent Service | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 09:56:08. Contact: ###-####.
P/S O/H R Ok 5/23/2002 6:02:08 PM
|
Rough-In Permanent Service | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 10:14:06. Contact: ###-####.
electroed ok for concrete 5/9/2002 3:01:49 PM
|
Permanent Service | 4/23/2002 | 4/23/2002 | 4/23/2002 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 08:22:12. Contact: ###-####. discujssed grouding conductor for service relocation on new addition. 4/23/2002 2:52:06 PM
|