Final | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/26/2002 at 10:18:54. Contact: ###-####.
|
Electrical Rough-In | 5/27/2002 | 5/28/2002 | 5/28/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/27/2002 at 15:06:04. Contact: ###-####.
|
Electrical Rough-In | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 14:53:37. Contact: ###-####. remove tile for inspection. 5/23/2002 11:53:40 AM
|
Electrical Rough-In | 4/24/2002 | 4/25/2002 | 4/25/2002 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 04/24/2002 at 13:53:09. Contact: ###-####. basemnt; suite#b110, walls r/i. 4/25/2002 9:47:24 AM
|