Final | 12/10/2002 | 12/10/2002 | 12/10/2002 | P | PASS |
Joe Ray
|
|
|
jerry- ###-#### work- call 1st before insp
|
Electrical Rough-In | 5/15/2002 | 5/16/2002 | 5/16/2002 | A | NR |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 19:18:34. Contact: ###-####.
|
Electrical Rough-In | 5/16/2002 | 5/16/2002 | 5/16/2002 | P | PASS |
Joe Ray
|
|
|
jerry- ###-#### r/i
|
Electrical Rough-In | 5/14/2002 | 5/15/2002 | 5/15/2002 | P | PASS |
Joe Ray
|
|
|
jerry- ###-#### r/i conf only 5/15/2002 5:01:45 PM
|
Electrical Rough-In | 5/6/2002 | 5/8/2002 | 5/8/2002 | P | PASS |
Joe Ray
|
|
|
CONFERENCE ONLY ###-#### JERRY
|
Electrical Rough-In | 5/6/2002 | 5/7/2002 | 5/7/2002 | P | CANC |
Joe Ray
|
|
|
CONFERENCE ONLY ###-#### JERRY home owner to reschedule 5/6/2002 1:53:33 PM
|