Final | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 21:18:17. Contact: ###-####. ok 7/2/2002 10:23:28 AM
|
Electrical Rough-In | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | CANC |
Jack Frank
|
|
|
###-####
|
Electrical Rough-In | 5/22/2002 | 5/23/2002 | 5/23/2002 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 17:09:51. Contact: ###-####.ri/ok/
ps/oh/reconn.-ok 5/23/2002 7:24:32 PM
|
Permanent Service | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PASS |
Tim McCullough
|
|
|
|
Permanent Service | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PASS |
Tim McCullough
|
|
|
ps/oh/recon. ok
|