Final | 8/16/2002 | 8/19/2002 | 8/19/2002 | A | PASS |
Jack Frank
|
|
|
call for access ###-#### ok 8/19/2002 10:40:10 AM
|
Final | 6/28/2002 | 7/2/2002 | 7/2/2002 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/28/2002 at 15:48:47. Contact: ###-####. conference only 7/2/2002 11:06:32 AM
|
Final | 6/27/2002 | 6/28/2002 | 6/28/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 08:51:22. Contact: ###-####. no cor. posted called too many things in violation will meet with contractor at job site a/c units on roof 6/28/2002 3:43:26 PM
|
Final | 6/25/2002 | 6/27/2002 | 6/27/2002 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 15:09:59. Contact: ###-####. no access they will reschedule 6/27/2002 11:30:41 AM
|