Final | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/14/2002 at 10:59:32. Contact: ###-####. ok cards signed 10/14/2002 2:18:39 PM
|
Final | 10/8/2002 | 10/9/2002 | 10/9/2002 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 15:35:38. Contact: ###-####. cor. posted called 250.122(B) 10/9/2002 12:26:06 PM
|
Electrical Rough-In | 8/1/2002 | 8/2/2002 | 8/2/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/01/2002 at 16:51:48. Contact: ###-####.
U/G to storage buildings ok 8/2/2002 11:25:34 AM
|
Rough-In Permanent Service | 7/10/2002 | 7/11/2002 | 7/11/2002 | A | PASS |
Joe Ray
|
|
|
BRIAN ###-#### p/s ug n ok 7/11/2002 2:54:07 PM
|
Electrical Rough-In | 6/18/2002 | 6/18/2002 | 6/18/2002 | P | PASS |
Joe Ray
|
|
|
###-#### jackie
|
Electrical Rough-In | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 09:24:14. Contact: ###-####. under ground slab in office only 5/10/2002 3:02:00 PM
|
Electrical Rough-In | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | PASS |
Pat Lass
|
|
|
UFER GROUND ###-#### JACKIE
|