Final | 5/24/2002 | 5/24/2002 | 5/24/2002 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 05/24/2002 at 09:44:13. Contact: ###-####.
ok/final 5/24/2002 3:51:20 PM
|
Electrical Rough-In | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PASS |
Jack Frank
|
|
|
for conf allen- ###-#### ok 5/21/2002 2:13:00 PM
|
Permanent Service | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PASS |
Jack Frank
|
|
|
ps/ug/new/meter
|
Rough-In Permanent Service | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/13/2002 at 10:38:36. Contact: ###-####. walls ok 5/13/2002 3:19:08 PM
|