Final | 8/22/2002 | 8/23/2002 | 8/23/2002 | A | PASS |
Jack Frank
|
|
|
###-#### both units ok 8/23/2002 11:21:36 AM
|
Electrical Rough-In | 5/20/2002 | 5/20/2002 | 5/20/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/20/2002 at 08:17:51. Contact: ###-####.so.east bedroom ok 5/20/2002 4:24:13 PM
|
Rough-In Permanent Service | 5/16/2002 | 5/17/2002 | 5/17/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/16/2002 at 17:12:00. Contact: ###-####. r/i ok except S E basement bedrm
p/s o/h rec. ok 5/17/2002 11:25:30 AM
|
Rough-In Permanent Service | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | PART |
Jack Frank
|
|
|
JOHN ###-#### partail r/i ok no p/s need grd to water within 5ft and 2 rods more wiring will be done in basement 5/13/2002 11:29:16 AM
|