Final | 7/3/2002 | 7/3/2002 | 7/3/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/03/2002 at 08:25:44. Contact: ###-####. ok 7/3/2002 5:27:21 PM
|
Electrical Rough-In | 6/11/2002 | 6/11/2002 | 6/11/2002 | P | PASS |
Jack Frank
|
|
|
ERIC ###-#### FOR CONF ONLY ok , and r/i for kit and sun room ok 6/11/2002 3:06:52 PM
|
Electrical Rough-In | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/10/2002 at 07:40:10. Contact: ###-####. called need to meet contractor at job site some corrections , will post after meeting with contractor 6/10/2002 6:18:38 PM
|