Final | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 17:27:20. Contact: ###-####. ok 7/9/2002 11:37:25 AM
|
Final | 6/24/2002 | 6/25/2002 | 6/25/2002 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 17:05:47. Contact: ###-####. called needs shelves install both walkin closets 6/25/2002 5:48:57 PM
|
Electrical Rough-In | 5/15/2002 | 5/15/2002 | 5/15/2002 | P | PASS |
Jack Frank
|
|
|
john ###-#### ok 5/15/2002 4:48:11 PM
|