Final | 3/12/2003 | 3/14/2003 | 3/14/2003 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 3/12/2003 at 11:33:36 AM. Contact: ###-####.
|
Electrical Rough-In | 6/12/2002 | 6/13/2002 | 6/13/2002 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 11:38:29. Contact: . conf. only 6/13/2002 10:23:30 AM
|