Rough-In Permanent Service | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PASS |
Pat Lass
|
|
|
DON ###-####
R/I Ok 7/11/2002 3:43:26 PM
|
Rough-In Permanent Service | 6/28/2002 | 6/28/2002 | 6/28/2002 | P | PART |
Pat Lass
|
|
|
had Conf.
P/S O/H R Ok 6/28/2002 5:09:57 PM
|
Rough-In Permanent Service | 6/18/2002 | 6/18/2002 | 6/18/2002 | P | NR |
Pat Lass
|
|
|
DON ###-#### House must be wired to code 6/18/2002 4:34:22 PM
|
Final | 5/31/2002 | 5/31/2002 | 5/31/2002 | P | FAIL |
Jim Schmer
|
|
|
DON ###-#### bnd ht & cold, ID neutral, Roof jack, grd rods 6' apart, grd. exiting meter need secured to meter, and grd bushing on meter side of nipple. STOP WORK POSTED for work and no permit on back of building. 5/31/2002 1:30:22 PM
|
Rough-In Permanent Service | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | NH |
Jim Schmer
|
|
|
DON no access & no phone number posted 5/31/2002 9:01:56 AM
|
Permanent Service | 5/17/2002 | 5/18/2002 | 5/18/2002 | A | NR |
Pat Lass
|
|
|
###-#### called and got message that phone was disconnected left notice for conf. too much wrong. COW 5/20/2002 10:25:23 AM
|