Final | 10/1/2002 | 10/1/2002 | 10/1/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/01/2002 at 07:01:36. Contact: ###-####.
|
Final | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 10:44:19. Contact: ###-####. cor. posted called 210.52(A)(D) upstairs bed rms downstairs by slider and bathrm by sink
9/27/2002 3:49:04 PM
|
Rough-In Permanent Service | 5/20/2002 | 5/21/2002 | 5/21/2002 | A | PASS |
Joe Ray
|
|
|
###-#### p/s ug n ok 5/21/2002 11:30:26 AM
|