ELE-Aging Inspection | 3/10/2003 | 3/10/2003 | 3/10/2003 | | DONE |
Pat Lass
|
|
|
|
Final | 12/19/2002 | 12/20/2002 | 12/20/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 12/19/2002 at 16:46:44. Contact: ###-####.
final/ok 12/20/2002 9:38:00 AM
|
Electrical Rough-In | 10/10/2002 | 10/10/2002 | 10/10/2002 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/10/2002 at 10:42:37. Contact: ###-####.
|
Electrical Rough-In | 10/9/2002 | 10/9/2002 | 10/9/2002 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/09/2002 at 09:42:12. Contact: ###-####.
access, surface extension and open wires 10/9/2002 4:07:54 PM
|