Final | 12/19/2002 | 12/20/2002 | 12/20/2002 | A | PASS |
Tim McCullough
|
|
|
###-#### paul
final/ok 12/20/2002 1:36:48 PM
|
Final | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | NR |
Pat Lass
|
|
|
###-#### PAUL
Entry way not finished, closet lights not enclosed, arc-fault not installed, and panel clearances not met. had conf. 12/19/2002 11:47:50 AM
|
Electrical Rough-In | 9/13/2002 | 9/13/2002 | 9/13/2002 | P | PASS |
Pat Lass
|
|
|
###-####
P/S U/G R Ok 9/13/2002 3:56:56 PM
|
Electrical Rough-In | 5/22/2002 | 5/22/2002 | 5/22/2002 | P | PASS |
Joe Ray
|
|
|
CELING PAUL ###-#### recess cans in ceiling ok for cover 5/22/2002 3:29:00 PM
|