Final | 7/11/2002 | 7/12/2002 | 7/12/2002 | A | PASS |
Jack Frank
|
|
|
final for x ray machine ###-#### final ok x-ray unit field evaluated by U L 7/12/2002 11:28:30 AM
|
Final | 7/2/2002 | 7/3/2002 | 7/3/2002 | A | PART |
Jack Frank
|
|
|
KENNY ###-#### temp only x-ray not to be used till it is field tested by testing lab, it is not listed. Test will be done within 30 days 7/3/2002 10:18:31 AM
|
Electrical Rough-In | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | PART |
Jack Frank
|
|
|
for conf- ###-####- kenny ok x-ray equip not listed 7/1/2002 4:30:32 PM
|
Final | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | FAIL |
Jack Frank
|
|
|
KENNY ###-#### called contractor for information x-ray unit not listed?, and needs redundant grd path, and remove cord installed in wall 6/28/2002 1:36:25 PM
|
Final | 6/28/2002 | 6/28/2002 | 6/28/2002 | P | NR |
Jack Frank
|
|
|
|
Electrical Rough-In | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | PASS |
Tim McCullough
|
|
|
kenny ###-####--r/i
|
Electrical Rough-In | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | PASS |
Joe Ray
|
|
|
FOR CONF- KENNY ###-####
|
Electrical Rough-In | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | DONE |
Tim McCullough
|
|
|
KENNY ###-#### CONF ONLY
conferance 5/23/2002 3:10:50 PM
5/23/2002 3:11:07 PM
|