Final | 7/31/2002 | 8/1/2002 | 8/1/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/31/2002 at 14:30:58. Contact: ###-####.
|
Electrical Rough-In | 5/29/2002 | 5/29/2002 | 5/29/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 09:44:41. Contact: ###-####. under ground for pool 5/29/2002 2:44:01 PM
|