Final | 7/10/2002 | 7/11/2002 | 7/11/2002 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 17:53:02. Contact: ###-####. ok final 7/11/2002 9:20:44 AM
|
Electrical Rough-In | 6/28/2002 | 6/28/2002 | 6/28/2002 | P | PASS |
Mike Kinnear
|
|
|
pool light lee- ###-#### ok light potting 6/28/2002 3:18:44 PM
|
Electrical Rough-In | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PASS |
Mike Kinnear
|
|
|
LEE ###-#### ok pool bond 6/10/2002 2:31:11 PM
|