Final | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 08/08/2002 at 07:44:06. Contact: ###-####.
final/ok 8/8/2002 3:36:51 PM
|
Rough-In Permanent Service | 6/12/2002 | 6/13/2002 | 6/13/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 13:05:54. Contact: ###-####. r/ iok
p/s u/g new ok 6/13/2002 11:51:24 AM
|
Rough-In Permanent Service | 6/12/2002 | 6/12/2002 | 6/12/2002 | P | NR |
Jack Frank
|
|
|
###-#### zane boxes not flush with finish material and 250.24 shall terminate GEC to the gruonded,neutral bus not equip grding bus met with contractor at job site 6/12/2002 3:03:01 PM
|