Final | 7/10/2002 | 7/11/2002 | 7/11/2002 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 16:51:52. Contact: ###-####. temp for 2 spaces only 7/11/2002 10:50:36 AM
|
Final | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 11:24:31. Contact: ###-####. ok final 7/11/2002 1:04:21 PM
|
Electrical Rough-In | 6/18/2002 | 6/19/2002 | 6/19/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/18/2002 at 11:39:39. Contact: ###-####.
walls in south central portion are ok 6/19/2002 10:20:27 AM
|
Electrical Rough-In | 6/12/2002 | 6/13/2002 | 6/13/2002 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 16:57:17. Contact: ###-####. walls 2nd floor S E corner of bluiding 6/13/2002 10:27:42 AM
|