Final | 7/22/2002 | 7/22/2002 | 7/22/2002 | P | PASS |
Mike Kinnear
|
|
|
key on left hand side by front door under rock; Phone #: ###-#### ok final 7/22/2002 2:08:34 PM
|
Final | 7/16/2002 | 7/18/2002 | 7/18/2002 | A | PART |
Jim Schmer
|
|
|
CLYDE; Phone #: ###-#### partial on final only, rewire patient care areas to NEC Article 517 with rudundent ground 7/18/2002 9:09:53 AM
|
Final | 7/16/2002 | 7/16/2002 | 7/16/2002 | P | FAIL |
Mike Kinnear
|
|
|
CLYDE ###-#### KEY LEFT OF DOOR IN A ENCAVE UNDER A ROCK all ceiling tile shall be removed for inspection 7/16/2002 2:10:57 PM
|
Electrical Rough-In | 6/17/2002 | 6/17/2002 | 6/17/2002 | P | PASS |
Mike Kinnear
|
|
|
###-#### CLYDE KEYS LEFT OF DOOR IN CUBBY HOLE UNDER A ROCK BY J-BOX ok cover walls only 6/17/2002 4:58:56 PM
|