Final | 8/7/2002 | 8/7/2002 | 8/7/2002 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 07:07:14. Contact: ###-####.
final/ok 8/7/2002 11:35:22 AM
|
Electrical Rough-In | 7/30/2002 | 7/30/2002 | 7/30/2002 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 11:22:48. Contact: ###-####. made up ok and ceiling cover ok 7/30/2002 4:39:37 PM
|
Rough-In Permanent Service | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | FAIL |
Jack Frank
|
|
|
chris cover ; Phone #: ###-#### cor. and 45.00 reinspection fee due called 110.12 seal ko s, 310.16 shall provide proper sized branch circuit wiring to fixtures that are daisy chained, shall have all make up of wires at boxes complete before inspection is requested 7/26/2002 5:54:28 PM
|
Electrical Rough-In | 7/10/2002 | 7/11/2002 | 7/11/2002 | A | PASS |
Jack Frank
|
|
|
bill- ###-####-ok to cover ok 7/11/2002 11:43:36 AM
|
Electrical Rough-In | 7/3/2002 | 7/3/2002 | 7/3/2002 | P | PART |
Jack Frank
|
|
|
NOLAN ###-#### walls upstairs, and walls and ceiling downstairs back of building 7/3/2002 2:51:43 PM
|
Electrical Rough-In | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | PART |
Jack Frank
|
|
|
dale ###-#### dividing wall only ok 6/28/2002 11:02:20 AM
|
Electrical Rough-In | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | FAIL |
Jack Frank
|
|
|
call 1st before insp- nolan- ###-#### cell
cor. posted met contractor at job site not ready, and 314.20 boxes set back more than 1/4 inch from combustible finished surface 6/26/2002 3:39:57 PM
|
Electrical Rough-In | 6/18/2002 | 6/18/2002 | 6/18/2002 | P | PART |
Jack Frank
|
|
|
###-#### Nolan Conference ok only no r/i 6/18/2002 3:19:03 PM
|