Final | 8/1/2002 | 8/2/2002 | 8/2/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 08/01/2002 at 22:16:52. Contact: ###-####.
final ok 8/2/2002 3:06:45 PM
|
Electrical Rough-In | 7/18/2002 | 7/19/2002 | 7/19/2002 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 07/18/2002 at 22:18:02. Contact: ###-####. light expoxied ok 7/19/2002 10:48:42 AM
|
Electrical Rough-In | 7/10/2002 | 7/11/2002 | 7/11/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 17:51:57. Contact: ###-####. bond for slide 7/11/2002 10:01:38 AM
|
Rough-In Permanent Service | 6/24/2002 | 6/24/2002 | 6/24/2002 | P | PASS |
Joe Ray
|
|
|
LEE ###-#### pool bond ok 6/24/2002 3:02:40 PM
|