Final | 10/4/2002 | 10/4/2002 | 10/4/2002 | P | PASS |
Pat Lass
|
|
|
ALAN ###-#### LIGHTING IN POOL
|
Final | 9/12/2002 | 9/13/2002 | 9/13/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/12/2002 at 20:46:18. Contact: ###-####.
|
Final | 8/20/2002 | 8/21/2002 | 8/21/2002 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 12:29:51. Contact: ###-####.
no light for panelboard 8/21/2002 8:59:14 AM
|
Electrical Rough-In | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | PASS |
Pat Lass
|
|
|
cover inspect on pool and spa light ###-#### lee
Potting ok 8/1/2002 3:35:15 PM
|
Rough-In Permanent Service | 6/24/2002 | 6/24/2002 | 6/24/2002 | P | PASS |
Mike Kinnear
|
|
|
LEE ###-#### ok cover pool bonding 6/24/2002 1:44:03 PM
|