Final | 7/24/2002 | 7/24/2002 | 7/24/2002 | P | PASS |
Jack Frank
|
|
|
###-#### cor. made ok 7/24/2002 3:40:55 PM
|
Final | 7/15/2002 | 7/15/2002 | 7/15/2002 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 07:08:47. Contact: ###-####. cor. posted called 300.10 shall bond conduits at non metallic boxes not at metallic boxes 7/15/2002 11:13:48 AM
|
Electrical Rough-In | 6/25/2002 | 6/26/2002 | 6/26/2002 | A | FAIL |
Jack Frank
|
|
|
r/i- please call 1st before insp/###-#### marv
met with contractor correction posted 300.10 shall install bond bushings where conduits enter non metallic boxes and R E washers are used 314.15 shall install hubs, sealing locknut, or washers for wet location(car wash) 6/26/2002 11:08:59 AM
|
Final | 6/24/2002 | 6/25/2002 | 6/25/2002 | A | CANC |
Jack Frank
|
|
|
marv- ###-#### fn called wrong address, and no access need to meet contractor for access 6/25/2002 10:57:47 AM
|