Final | 9/3/2002 | 9/4/2002 | 9/4/2002 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 10:49:34. Contact: ###-####.
final/ok 9/4/2002 2:14:38 PM
|
Electrical Rough-In | 7/2/2002 | 7/3/2002 | 7/3/2002 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 07/02/2002 at 14:10:34. Contact: ###-####.
|
Electrical Rough-In | 6/28/2002 | 7/1/2002 | 7/1/2002 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/28/2002 at 15:33:22. Contact: ###-####. cor. posted called 300.4 nail plates and 11/4 inches, 110.12(A) seal unused openings, 314.16 box fill, 250.148 splice all equip grds together, 210.52 (A)(B) outlet spacing in dinning where door was moved, and proper outlet spacing for countertop outlets 7/1/2002 11:21:02 AM
|