Final | 10/3/2002 | 10/3/2002 | 10/3/2002 | P | PASS |
Jack Frank
|
|
|
###-#### ok 10/3/2002 3:54:03 PM
|
Final | 10/1/2002 | 10/2/2002 | 10/2/2002 | A | FAIL |
Pat Lass
|
|
|
DAVE ###-####
Location of rerceps in kitchen and open neutral 10/2/2002 10:48:07 AM
|
Final | 9/24/2002 | 9/25/2002 | 9/25/2002 | A | FAIL |
Jack Frank
|
|
|
###-#### called all the gfci are messed up contractor needs to check his work before final is called for 9/25/2002 10:25:43 AM
|
Rough-In Permanent Service | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | PASS |
Mike Kinnear
|
|
|
DAVE ###-#### ok cover ri p/s u/g n ok 7/26/2002 10:19:34 AM
|
Electrical Rough-In | 7/19/2002 | 7/19/2002 | 7/19/2002 | P | PASS |
Joe Ray
|
|
|
for conf- dave- ###-#### conference only 7/19/2002 1:11:24 PM
|
Electrical Rough-In | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | PASS |
Mike Kinnear
|
|
|
JUST THE FRONT ENTRY DAVE ###-#### ok cover entry only 6/28/2002 8:28:37 AM
|