Temporary Service | 7/3/2002 | 7/3/2002 | 7/3/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/03/2002 at 07:57:58. Contact: ###-####.
t/s u/g new ok 7/3/2002 12:28:00 PM
|
Temporary Service | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 13:41:21. Contact: ###-####. cor. posted called need gfci for 220 volt 7/2/2002 1:46:40 PM
|