Final | 9/3/2002 | 9/4/2002 | 9/4/2002 | A | PASS |
Tim McCullough
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
final/ok 9/4/2002 10:28:05 AM
|
Final | 8/30/2002 | 8/30/2002 | 8/30/2002 | P | NR |
Pat Lass
|
|
|
fn -rod- ###-####
will reschedual 8/30/2002 3:02:52 PM
|
Electrical Rough-In | 7/18/2002 | 7/19/2002 | 7/19/2002 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/18/2002 at 20:59:06. Contact: ###-####.
not ready. 7/19/2002 7:56:17 AM
|
Electrical Rough-In | 7/19/2002 | 7/19/2002 | 7/19/2002 | P | PASS |
Pat Lass
|
|
|
rod- ###-#### r/i
|
Electrical Rough-In | 7/18/2002 | 7/18/2002 | 7/18/2002 | P | NR |
Pat Lass
|
|
|
r/i rod- ###-####
Had conf. 7/18/2002 3:38:11 PM
|
Permanent Service | 7/2/2002 | 7/2/2002 | 7/2/2002 | P | PASS |
Tim McCullough
|
|
|
###-####
ps/ok/oh/recon. 7/2/2002 2:52:50 PM
|