Final | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/31/2002 at 09:36:21. Contact: ###-####. ok 7/31/2002 5:20:46 PM
|
Electrical Rough-In | 7/8/2002 | 7/8/2002 | 7/8/2002 | P | PASS |
Jack Frank
|
|
|
r/i for new hallway and 2 restrooms ok
|
Final | 7/8/2002 | 7/8/2002 | 7/8/2002 | P | CANC |
Jack Frank
|
|
|
BRAD ###-#### FN no final see added r/i 7/8/2002 5:59:29 PM
|
Final | 7/2/2002 | 7/3/2002 | 7/3/2002 | P | FAIL |
Jack Frank
|
|
|
fn brad- ###-####--calvary chapel bld #4154 yrds s.w. of main bld( a little more than s.)1st door closet to the roll up door, 2nd door on the left which is 7 paces to the w., 6 paces s to 1st bathroom, 4 paces s to 2nd bathroom what does this message mean? called left message to have contractor call me ,I need information 7/3/2002 6:29:50 PM
|