Final | 10/4/2002 | 10/4/2002 | 10/4/2002 | A | PASS |
Jack Frank
|
|
|
ok
|
Final | 10/2/2002 | 10/2/2002 | 10/2/2002 | P | FAIL |
Jack Frank
|
|
|
###-#### kevin gfci needed for upstairs bath install all light fixtures, correct, hot grd reversed at recepts hall and family rm met with contractor 10/2/2002 3:12:15 PM
|
Electrical Rough-In | 7/10/2002 | 7/11/2002 | 7/11/2002 | A | PASS |
Jack Frank
|
|
|
###-#### CONFERENCE CALL FIRST r/i ok 7/11/2002 1:54:26 PM
|
Permanent Service | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PASS |
Jack Frank
|
|
|
p/s u/g new ok
|
Electrical Rough-In | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | FAIL |
Jack Frank
|
|
|
kevin ###-#### corrections not made called 7/10/2002 2:44:24 PM
|
Rough-In Permanent Service | 7/5/2002 | 7/8/2002 | 7/8/2002 | A | FAIL |
Jack Frank
|
|
|
KEVIN ###-#### cor. posted called 314.20, 314.17 broken clamps in 2,3,4 gang boxes, 300.4(A)(1)&(D), 210.52 (A) 7/8/2002 12:03:43 PM
|