Final | 10/14/2003 | 10/14/2003 | 10/14/2003 | P | PASS |
William E Thomas
|
|
|
javier; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
final ok 10/14/2003 12:35:19 PM
|
Final | 12/30/2002 | 12/31/2002 | 12/31/2002 | P | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/30/2002 at 13:36:31. Contact: ###-####. final on kitchen and dinning room/partial / contr not finished 12/31/2002 12:26:55 PM 12/31/2002 12:28:39 PM
|
Electrical Rough-In | 8/18/2002 | 8/19/2002 | 8/19/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/18/2002 at 15:54:40. Contact: ###-####. ok 8/19/2002 1:20:45 PM
|
Rough-In Permanent Service | 8/15/2002 | 8/16/2002 | 8/16/2002 | A | NH |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/15/2002 at 13:53:20. Contact: . notice posted 8/16/2002 10:40:29 AM
|
Electrical Rough-In | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | PART |
Jack Frank
|
|
|
met with owner conference ok
|
Final | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | NH |
Jack Frank
|
|
|
###-#### called notice posted 7/30/2002 10:33:30 AM
|