Final | 9/17/2002 | 9/18/2002 | 9/18/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 15:44:49. Contact: ###-####.
final/ok 9/18/2002 2:45:56 PM
|
Rough-In Permanent Service | 7/12/2002 | 7/15/2002 | 7/15/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/12/2002 at 13:39:22. Contact: ###-####.
R/I Ok 7/15/2002 11:22:54 AM
P/S U/G N Ok per JF 7/15/2002 11:49:18 AM
|
Rough-In Permanent Service | 7/12/2002 | 7/12/2002 | 7/12/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/12/2002 at 08:40:28. Contact: ###-####. corrections not made needs 300.(A)(1)and(D) and 314.20 set boxes flush with finish surface talked with contractor at job site he called electrical contractor 7/12/2002 2:57:16 PM
|
Rough-In Permanent Service | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | FAIL |
Jack Frank
|
|
|
###-#### roger cor. posted called 300.(A)(1)&(D) 210.52(A) outlet required for wall space in kit. right of pantry, 314.20 boxes not flush with finish surface 7/11/2002 3:51:00 PM
|