Final | 10/21/2002 | 10/22/2002 | 10/22/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 10/21/2002 at 19:04:24. Contact: ###-####.
final ok 10/22/2002 11:03:55 AM
|
Electrical Rough-In | 8/5/2002 | 8/6/2002 | 8/6/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/05/2002 at 10:04:00. Contact: ###-####.
|
Electrical Rough-In | 8/2/2002 | 8/5/2002 | 8/5/2002 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 10:48:50. Contact: ###-####. 300-4 1 1/4 protection/ 8/5/2002 9:42:04 AM
|
Electrical Rough-In | 7/12/2002 | 7/15/2002 | 7/15/2002 | A | PASS |
Joe Ray
|
|
|
FOR CONF 9:00 PER JOE RAY VICKI- ###-####
|