Final | 2/5/2003 | 2/5/2003 | 2/5/2003 | P | PASS |
Mike Kinnear
|
|
|
asap if possible\\###-#### ok final 2/5/2003 2:07:44 PM
|
Electrical Rough-In | 7/22/2002 | 7/23/2002 | 7/23/2002 | A | PASS |
Mike Kinnear
|
|
|
###-#### ok cover ri 7/23/2002 9:42:10 AM
|
Electrical Rough-In | 7/18/2002 | 7/19/2002 | 7/19/2002 | A | PART |
Mike Kinnear
|
|
|
CONFERENCE ###-#### conf with home owner 7/19/2002 9:36:54 AM
|
Electrical Rough-In | 7/18/2002 | 7/18/2002 | 7/18/2002 | P | NR |
Mike Kinnear
|
|
|
###-#### COW t/w wife told her that her husband needs to call for another inspection & make arrangements for conf. (left my card) 7/18/2002 1:54:14 PM
|