DOC - Permit Finaled | | | 3/7/2003 | | DONE |
|
|
|
post card already finaled
|
Final | 8/12/2002 | 8/13/2002 | 8/13/2002 | A | PASS |
Tim McCullough
|
|
|
###-####
final/ok 8/13/2002 1:49:56 PM
|
Rough-In Permanent Service | 7/18/2002 | 7/18/2002 | 7/18/2002 | P | FAIL |
Jack Frank
|
|
|
TERRY ###-#### cor. posted called 310.15 derate conductors at 50% 300.10 1/2 conduit needs locknuts and bond bushing for R E washers 7/18/2002 5:08:15 PM
|