DOC - Permit Finaled | | | 10/6/2003 | | DONE |
|
|
|
|
Final | 11/4/2002 | 11/5/2002 | 11/5/2002 | P | PASS |
Jim Schmer
|
|
|
Please call before inspection to set up time.; Phone #: ###-#### Internet Inspection Request from: Joe Thomas
|
Electrical Rough-In | 9/12/2002 | 9/13/2002 | 9/13/2002 | P | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 09/12/2002 at 14:38:03. Contact: ###-####. ok cover part ri 9/13/2002 1:48:42 PM
|
Final | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | FAIL |
Jack Frank
|
|
|
1 st thing call denise hodges 3431685 for app.! called cor. posted job not ready they are adding new walls need proper outlet spacing, reversed polarity plugs need shelves in MB closet, remove gas pipe below outside panel, bonding for spa and outlet too close to spa ,this job is a complete mess 9/6/2002 12:01:23 PM
|
Final | 9/4/2002 | 9/5/2002 | 9/5/2002 | A | NH |
Tim McCullough
|
|
|
called left message to call me to set app. 9/5/2002 4:04:01 PM
|
Final | 9/3/2002 | 9/4/2002 | 9/4/2002 | A | NR |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 17:52:10. Contact: ###-####.
not ready 9/4/2002 4:06:12 PM
|
Electrical Rough-In | 7/23/2002 | 7/24/2002 | 7/24/2002 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 07/23/2002 at 17:24:04. Contact: ###-####. ok cover ri 7/24/2002 10:18:34 AM
|
Electrical Rough-In | 7/22/2002 | 7/23/2002 | 7/23/2002 | A | FAIL |
Jack Frank
|
|
|
###-#### need to meet with with 412 will post correction then called contractor 7/23/2002 11:52:53 AM
|
Electrical Rough-In | 7/23/2002 | 7/23/2002 | 7/23/2002 | P | FAIL |
Jack Frank
|
|
|
cor. posted met contractor at job 110.26(F)(2), 314.20, and 16, 210.52 (A)(B),and 70 exception 7/23/2002 4:58:22 PM
|
Electrical Rough-In | 7/19/2002 | 7/22/2002 | 7/22/2002 | A | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 07/19/2002 at 15:47:09. Contact: ###-####. not ready 7/22/2002 10:36:35 AM
|