Final | 3/17/2003 | 3/18/2003 | 3/18/2003 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/17/2003 at 10:59:57 AM. Contact: ###-####. ok 3/18/2003 8:41:09 AM
|
Electrical Rough-In | 10/22/2002 | 10/23/2002 | 10/23/2002 | A | PART |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung cover for electrode ok 10/23/2002 10:49:06 AM
|
Electrical Rough-In | 9/22/2002 | 9/24/2002 | 9/24/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/22/2002 at 21:29:53. Contact: ###-####. ok 9/24/2002 6:54:37 PM
|
Electrical Rough-In | 8/28/2002 | 8/29/2002 | 8/29/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 18:11:48. Contact: ###-####. met with owner see jf for details 8/29/2002 7:28:16 PM
|
Electrical Rough-In | 8/13/2002 | 8/15/2002 | 8/15/2002 | A | PART |
Mike Kinnear
|
|
|
BART; Phone #: ###-#### COW conf with home owner 8/15/2002 10:35:16 AM
|